Smart Cantt Mission

Adequate Water Supply

PRESENT WATER SUPPLY 135 Ltrs/Capita/ day
WATER SUPPLY MEETING STANDARD NORMS 5.5 hrs of Water Supply per day
EXTENSION OF PIPED SUPPLY, 04 VT PUMPS & CHLORINATION PLANTS (SPECIAL GRANT PROJECT)
  • Total sanctioned cost- 219 Lakhs
  • Status– 80% work completed
  • Total payments – 110 Lakhs
PROVISION OF 02 OHT (SPECIAL GRANT PROJECT)
  • Estimated cost – 294 Lakhs
  • Bid documents prepared for hiring expert to prepare DPR
  • Work to be done in FY 2017-18

Rooftop Solar Power Projects

PROJECTS UNDER PHASE –I
TOTAL COST 37.37 LAKHS
STATUS COMPLETED ON 25.11.2016
AGENCY REFERRED BY SECI M/S JACKSON ENGINEERS LTD
APPROVED RATES BY SECI RS. 88.55 /WP FOR SCHOOLS &
RS. 73/WP FOR OFFICE
SUBSIDY OFFERED D BY SECI 5% FOR SCHOOLS & 30% FOR CB OFFICE
NAME OF BUILDING CAPACITY COST (Rs)
Cantt Board Office Building 40 KW 2044000.00
RA Bazar Jr. High School 05 KW 376337.50
BC Bazar Primary School 05 KW 376337.50
BI Bazar Primary School 05 KW 376337.50
Adhaarshilla Public School 07.5 KW 564506.25
Total 62.5 KW 3737518.75
  • Implementation of rain water harvesting

  • TOTAL COST – 75.08 Lakhs
  • STATUS – COMPLETED ON 28.02.2017
  • DESCRIPTION OF CF BUILDING AREA (SQM)
    Cantt Board Office 10218
    Cantonment General Hospita l15499
    Adharshila Public School 1176
    Primary School R A Bazaar 881
    Primary School B I Bazaar 851
    Primary School B C Bazaar 860
    TOTAL 29485
    PHASE II – ASHIANA GUEST HOUSE IN FY 2017-18
  • Improvement in Sanitary Services

  • UNDER GROUND SEWERAGE SCHEME
    • PHASE I- Proposal submitted
    • PHASE II&III – Proposal to be submitted after sanction of PHASE I
  • SWM PLANT PROPOSED AT TRENCHING GROUND
    • Detailed design & DPR prepared – Estimated cost -360 Lakhs
      • Components –
      • Recycling of waste
      • Manure from dry leaves
      • Renewable Energy scheme from dairy waste - Electricity & Cooking Gas
  • BIO –TOILETS (GREEN)
    • Installed – 02 in CB Office
    • 06 proposed to be installed in schools & Hospital in FY 2017-18
  • BIO DIGESTOR BASED PGL‘s- All PGL's proposed for conversion under Swacch Bharat Abhiyan at cost of Rs.274 Lakhs by 30 Sept 2017
  • PROCUREMENT OF SANITARY VEHICLES – 06 TIPPERS SANCTIONED IN FY 2016-17
  • 02 YEARS SWACCH CHAWANI SWASTHA CHAWANI PROGRAMME
  • Implementation of E-Governance

  • SMART SERVICES UNDER BOARD
  • Online grievance redressal system
    • Santushti’ mobile App  at cost of Rs.49,000
    • Swacch chawni Swastha Chawni’ mobile App at cost of Rs.48,000
    • WhatsApp’ complaint facility
    • Samadhan telephonic complaint facility
    • Web based complaint redressal system on interactive web site
  • Online Tax payment
    • Software prepared – cost 3. 50 Lakh
    • Under trial
    • Scheduled date of launch – 15.4.2017
  • Other online services  scheduled to start by 15.05.2017
  • Provision of water atm at public places

  • 05 Water ATM installed
  • Facility to draw water through prepaid cards & coins
  • Rate of water - Rs1/Ltr
  • Cost of ATM – Rs. 4.38 lakhs / unit
  • Water discharge – 500 Ltr/ hr
  • Fitted with LED Display
  • ATM powered by Solar Energy
  • 16 additional water ATMs proposed in 2017-18
  • Expected commissioning -30.06.2017
  • Rooftop Solar Power Projects

  • ESTIMATED COST - 123 LAKHS (AS PER SECI’S APPROVED RATES)
  • SCHEDULED COMPLETION – 30.09.2017
  • CF BUILDING CAPACITY
    CAB Inter College 40 KW
    Cantt General Hospital 05 KW
    Gandhi Bagh 05 KW
    Marriage House 15 KW
    Ashiyana Guest House 15 KW
    CB Library West End Road 02 KW
    Cattle Pound 02 KW
    Total 84 KW
    PHASE II WILL COMMENCE AFTER FINALIZING AGENCY IN FY 2017-18 AS SECI’S SUBSIDY SCHEME IS OVER
  • Conversion of existing street light fittings into led fittings

  • TOTAL EXISTING STREET LIGHT POINTS SVLS /MHLS (400/250/150 WATT) – 2312
  • PLANNED TO BE REPLACED DURING 2016-2017 - 2177
  • REPLACED DURING 2016-2017 - 2177
  • STATUS - COMPLETED
  • EXPENDITURE - 236 Lakhs
  • ALL STREET LIGHT FITTINGS CONVERTED INTO 90 WATTS LEDs
  • PRESENT MONTHLY BILL OF STREET LIGHTS – 19.06 LAKHS
  • EXPECTED MONTHLY BILL AFTER CONVERSION – 11.18 LAKHS
  • (AT EXISTING TARRIF RATES)
  • SAVINGS PER MONTH - 7.88 LAKHS
  • ANNUAL SAVINGS - 94 LAKHS

Working Women Hostel

Proposal submitted Jan 2017
Estimated Cost of Project 209.41 Lakhs
Grant required @ 75% of the project cost 157.06 Lakhs
Cost to be borne by Cantt Board @ 25% of the project cost 52.35 Lakhs
Number of Working Women to be facilitated 61 Nos
Survey No. 183/738
Classification of Land “C”
Area of the Project 10036.96 Sqft to be used out of total area of 1.019 acre (44387.64 Sqft)
No. of Rooms 29 Rooms excluding Common Room, Utilities & Staff Rooms
Expected completion 01 Yr from date of sanction
  • Specially being developed at Gandhi Bagh

    • FACILITIES-
    • SUPPORTEDWALKWAYS
    • RESTINGHUTS
    • OXYGENINTAKEMASKS
    • PHYSIOTHERAPYFACILITY
    • MUSICANDREADINGFACILITY
    • MALEANDFEMALEATTENDANT
    • CARETAKER
    • GAMES
    • TOILETS
    Gandhi Bagh